Skip to content
sales@ibstroy.com
IB Stroy — home

Buildings for a mine-site camp

Housing, canteen, office and warehouses ready to receive people before mining begins.

What the site needs before work begins

The camp must be ready for people before the equipment arrives on site.

Dormitories

Buildings of 8 modules, rooms for 2–4 people.

Canteen

Dining hall, kitchen and food store next to the living area.

Office and medical point

Site headquarters, consulting room, isolation ward.

Bathhouse and laundry

Showers and a workwear drying room for after the shift.

Gate

Entry post, personnel and vehicle control.

Hangars and warehouses

For equipment repair and spare parts storage.

How we plan a camp

We agree the layout with your designer and security team.

Housing kept apart from equipment

Dormitories are set apart from the hangar, parking and waste area.

Building spacing

Building groups are separated by fire breaks.

Two exits from each dormitory

Every residential building has exits on both sides.

Firefighting water

Fire water tank and fire engine access.

We work at remote sites

We assemble at our base

Modules arrive ready-made. On site, we only join and connect them.

We deliver ourselves

We deliver where there are no roads and no hotels for the crew.

Scale up in phases

Housing for the first shift first, then the remaining buildings.

Where we have built

Mining company sites where our buildings stand.

  • Aktogay
  • Shubarkol
  • Borly
  • Akbakay
  • Zhanatas
  • Zhezkazgan

All projects

Request a quote with drawings and an itemized estimate

+7 707 890 4900
Request a quote
CallWhatsAppRequest a quote